Case Studies

  • Mossmorran Wind Farm

    DNO contestable 11Kv Grid Connection - 4.6mw – Wind Turbine Farm - Involving 5.5kms of cabling

    Read More
  • RCD-Case-Study-Map

    Calvert – Bucks, Energy from Waste Plant

    The Multi -Million Efw project would be generating a max export of 27mw through a DNO contestable 33Kv Grid Connection

    Read More
  • RCD-Gretton-Solar-Farm

    Gretton PV Generation: HV Contestable & Substation Build

    Project involved the Design and Construction of a 11kv Grid contestable connection comprising of cable route Switchgear & substation build.

    Read More
  • Telford2

    Telford Southwater Development

    RCD`s project was Design, Installation & Adoption of a major Gas & Water Mains & Services infrastructure, for the new

    Read More
  • bbc

    BBC Studios

    Major electrical infrastructure refurbishment for the BBC Studios based in a heavily congested part of London.

    Read More
  • Case-Study_Cardiff-Sports-Village

    Cardiff Sports Village

    Installation of cabling from a DNO connection primary sub to a new SSE for the multi-million pound Cardiff Bay development.

    Read More
  • Calvert3

    Calvert – HV Contestable & Private Distribution Supply

    Project involved the Design and Construction of a new combined 11kv Electrical Substation to accommodate DNO Contestable & Private11kv switch

    Read More
  • wembley

    Wembley Stadium

    We worked to connect enough power to the new Wembley Stadium site in a heavily built up area of London.

    Read More