Dunstable Multi-Utility

 

  • Client: Complex Development Projects / SSE
  • Location: Dunstable
  • Description: 1800m Multi-Utility Project
  • Duration: 16 Weeks
  • Value: £298,000

dunstable

  • Full Turnkey – Multi - Utility
  • Local Authority Liaison
  • Construction 11KV ,Water, Gas & Telecom networks
  • Construction of Joint Bays & Telecom Access Chambers
  • Directional Drilling
  • Civil Engineering - Demolishing & Creating new Bus Lay By
  • Network Construction
  • Reinstatement / Associated Civils Works

RCD project managed and supervised the scheme offering a full turnkey package. Liaison with the principal contractor and asset management organisations took place throughout the construction, with the route going through private land. In order to maintain the agreed route, directional drilling was required under a temporary redundant railway line. The railway line integrity needed to be maintained as the line was soon to be opened for future Rail Passenger use. The project entailed two points of connection, one for the Dunstable Theatre and a further connection for the other for commercial developments. In conjunction with the construction of the Utilities Project. RCD were required to civil engineer a bus lay-by and turning point for the local Highway Authority.