  • Client: Eurotunnel / EDF
  • Location: Outer London near A13
  • Description: 700m of 36 Way Duct and Cabling Work
  • Duration: 12 Weeks
  • Value: £493,000

The purpose of these works was to install an electrical network to provide the power to the Eurotunnel boring machine, this involved major construction work including the removal and relocation of several large concrete transformer pads with the use of specialist plant brought in.

This also included deep excavation work at night in order to meet the time scale and pavement regeneration a large percentage of the work could only be carried out through the night.

eurotunnel

  • Deep excavations
  • Construction of 132 KV , 33KV network
  • Demolition and Construction works
  • Liaison with all Stakeholders and Local Authority
  • Duct and Cabling work
  • Special Traffic Management
  • Extensive Night Working
  • Palisade Fencing
  • Reinstatement / Associated Civils Works